Green AI Infrastructure

Own the Power
Behind AI.

Off-grid, green AI infrastructure — delivered turnkey, owned by you, operated by us.

100MW

Modular Clusters

24/7

Off-Grid Power

$0.02

Per kWh O&M

99.99%

Availability

The Challenge

AI is energy-constrained, not compute-constrained.

The bottleneck has shifted. While GPU supply improves, power infrastructure remains the critical limiting factor for AI scale.

01

Grid Delays

4-7 years to secure utility-scale grid connections for new AI facilities.

02

ESG Pressure

Investors and regulators demand renewable, low-carbon infrastructure.

03

Price Volatility

Energy costs fluctuate unpredictably, undermining long-term planning.

04

Capital Misallocation

AI companies forced to build power expertise instead of focusing on AI.

Our Solution

The VOLT AI Solution

We deliver complete, off-grid AI data center infrastructure. You own the asset. We operate it. No grid dependency. No ESG compromise.

AI Data

Center

Solar

BESS

Thermal

Control

  • Own your AI data center
  • Off-grid green power
  • Incentive-optimized
  • We handle design, build, operate
Process

How It Works

A streamlined process from design to operations.

01

Site & Power Design

We analyze your requirements and design a custom off-grid power solution optimized for your AI workloads.

02

Turnkey EPC Delivery

Complete engineering, procurement, and construction of your data center and power infrastructure.

03

Asset Ownership Transfer

You take ownership of the complete infrastructure, capturing ITC benefits and depreciation.

04

Long-Term Operations

We operate and maintain the facility at $0.02/kWh, ensuring 99.99%+ availability.

Economics

A model that works for both parties.

For AI Companies

  • Asset Ownership

    Full ownership of data center and power infrastructure

  • ITC & Depreciation

    Capture federal investment tax credits and accelerated depreciation

  • Power Certainty

    Fixed-cost, long-term power independent of grid volatility

  • Faster Deployment

    18-month timeline vs 4-7 years for grid-connected facilities

For Voltium

  • EPC Margin

    Competitive margins on turnkey infrastructure delivery

  • $0.02/kWh Annuity

    Long-term O&M contracts with CPI escalation

  • Scalable Platform

    Repeatable model for rapid deployment at scale

Build AI.

We'll build and operate the infrastructure behind it.